Price |
Free
|
$
450
USD
|
$
950
USD
|
$
3,500
USD
|
Maximum Number of Fault Tree Items |
30 |
100 |
300 |
Unlimited |
Classical Minimal Cut Sets Method |
|
|
|
|
Binary Decision Diagram Method |
|
|
|
|
Fault Tree Evaluation |
Minimal Cut Sets |
|
|
|
|
Unavailability |
|
|
|
|
Availability |
|
|
|
|
Reliability |
|
|
|
|
Unreliability |
|
|
|
|
Unconditional Failure Intensity |
|
|
|
|
Conditional Failure Intensity |
|
|
|
|
Expected Number of Failures |
|
|
|
|
Total Down Time |
|
|
|
|
Average Unavailability |
|
|
|
|
Average Unconditional Failure Intensity |
|
|
|
|
Average Conditional Failure Intensity |
|
|
|
|
Probability of Failure on Demand (PFD) |
|
|
|
|
Average Probability of Failure on Demand (PFD Avg) |
|
|
|
|
Probability of Failure per Hour (PFH) |
|
|
|
|
Average Probability of Failure per Hour (PFH Avg) |
|
|
|
|
Marginal Importance Factor (Birnbaum Importance) |
|
|
|
|
Critical Importance Factor (Fussell-Vesely Importance) |
|
|
|
|
Risk Achievement Worth |
|
|
|
|
Risk Reduction Worth |
|
|
|
|
Diagnostic Importance Factor |
|
|
|
|